Proposals, reports and audits for architects and engineers

Win the commission with a staged fee proposal, then deliver the work in the same editor: condition audits, inspection reports and specifications your clients accept and sign online.

QuoteCloud is a document editor that architects, engineers and specifiers use for more than sales. Fee proposals price each work stage as a fixed fee or a percentage of construction cost. The same content blocks build condition audits and inspection reports with marked-up photos, rating tables and priced recommended works that the client accepts and signs online.

A sample QuoteCloud editor window for a fictional practice, Fenwick Arden, with a rail of content blocks (text, image and markup, table, price table, contents, Gantt chart, eSignature). The document on the canvas changes every few seconds: a fee proposal for the Okoro house with four work stages priced as a fixed fee and percentages of a $1,450,000 construction cost ($125,250 in total), a building condition audit finding with a marked-up photo of cracked render rated C4 Poor and priority P1, and a finishes schedule for a school science building. The blocks each document uses light up.

Every document a commission needs, from one editor

QuoteCloud isn't only for the fee proposal. The same blocks, templates and branding build the reports, audits and schedules that follow it, and each one can be accepted and signed online.

01Win the commissionSales documents

No.DocumentBuilt fromSigned off by
FA-2405Staged fee proposalOkoro house · private clientFee stagesPrice tableGantt chartBoth clients sign
FA-S-0417Finishes & product scheduleSt Aldric's College · schoolTableImagesCommentsSamples approved
FA-T-0611Tender responseRiverbend CouncilContentsLocked library blocksPrice tableDirector approves
AS-02Engagement letter & fee variationOkoro houseLocked termsTableClient signs first

02Deliver the workReports and audits

No.DocumentBuilt fromSigned off by
FA-R-1187Building condition auditThe Pembroke · apartment buildingRatings tableImage markupPrice tableCommittee accepts
FA-M-0932Mechanical plant inspectionQuayline Property Group · landlordAsset registerScheduleImagesAsset manager accepts
FA-D-0214Site inspection & defect reportOkoro house · during the buildImage markupTableCommentsClient acknowledges
FA-O-0388Design report & option studySt Aldric's CollegeGalleryTableOptional price itemsOption chosen and signed

Sample documents for a fictional practice. Audit and inspection reports are built from content blocks, or from your own report template, converted for you during the trial.

Anatomy of a building condition audit

An apartment building's condition report, read top to bottom. Every part is a QuoteCloud content block, and the recommended works are a live price table: tick an option and the approved fees in the sign-off follow.

  1. A report that reads like your practice

    Your cover, your typography and a contents block with anchor links. Export the finished report as a PDF for the building manager's files.

    PDF export: Starter and up

    Practice templates & library
    Fenwick ArdenBuilding condition auditFA-R-1187Sample · fictional business
    A mid-rise apartment building with balconies against a blue sky

    Building condition audit

    The Pembroke, 22 Harbour Row

    Prepared for The Pembroke Owners' Association · 14 May · Revision B

    A visual condition audit of a 1970s six-storey residential building with 36 apartments: roof, facade, balconies, common areas, building services and fire stairs, with the works we recommend over the next five years.

    Contents

    1. 1Executive summarypage 2
    2. 2Method & limitationspage 3
    3. 3Condition ratings by elementpage 4
    4. 4Key findingspage 6
    5. 5Recommended works & feespage 11
    6. 6Acceptancepage 13
  2. The summary a committee actually reads

    Overall condition, how many elements sit at each rating, the works by priority and the budget, written by your assessor in text and table blocks.

    Executive summary

    C3Fair overall

    The building is in fair condition for its age. The roof membrane and the north facade need attention within 12 months to stop water getting in; most other elements need routine maintenance only.

    • P13Within 12 months
    • P231 to 3 years
    • P343 to 5 years

    19 elements rated

    1. C1 · Very good2
    2. C2 · Good5
    3. C3 · Fair7
    4. C4 · Poor4
    5. C5 · Very poor1

    Budget for recommended worksOpinion of probable cost, ex tax$553,000

  3. Every element rated

    A condition table with the location, a 1 to 5 rating, the risk, the action and a budget. Save it to the content library and every audit starts with the same columns.

    Content library: Essentials and up

    Building condition & compliance audits

    Condition ratings by element 7 of 19 elements shown

    ElementConditionRiskActionPriority · budget
    Roof membrane & flashingsMain roofC4 PoorHighReplace membrane, renew flashingsP1 · $185,000
    Render & sealant jointsNorth and west facadesC4 PoorHighRepair cracked render, reseal jointsP1 · $96,000
    Fire stair doorsStairs A and BC3 FairHighAdjust closers, replace two door setsP1 · $18,000
    Car park soffitBasementC3 FairMediumPatch spalling, treat exposed reinforcementP2 · $64,000
    Rooftop condensersRoof plant deckC4 PoorMediumReplace two units, re-support pipeworkP2 · $42,000
    Balcony balustradesLevels 2 to 6C3 FairMediumTest fixings, replace six corroded postsP2 · $28,000
    Common stairs & corridorsAll levelsC2 GoodLowRepaint, replace worn stair nosingsP3 · $38,000

    Ratings 1 (very good) to 5 (very poor), from a visual inspection on 6 May. Budgets are opinions of probable cost for planning, ex tax.

  4. Photos marked up where the problem is

    Add site photos and mark them up in the built-in image editor with numbered labels, rings and arrows, beside the finding and your recommendation.

    Image blocks and image editor: Starter and up

    Site inspection & defect reports

    Key findings

    1. Cracked, crumbling render exposing the brickwork at the base of a wall
      1. Debonded render
      2. Exposed brick

      F-04C4 · PoorP1

      Render cracking at the base of the north wall

      Finding
      Render has cracked and come away at the base of the wall, exposing brickwork and letting water into the wall.
      Recommendation
      Remove loose render, repair the brickwork and re-render; reseal the joints either side.
    2. Rooftop condenser units with fans and refrigerant pipework
      1. Corroded casing
      2. Unsupported pipework

      F-09C4 · PoorP2

      Corrosion on the rooftop condensers

      Finding
      Two of the six condenser units have corroded casings and fan guards, and refrigerant pipework sags between supports.
      Recommendation
      Replace the two units and add pipe supports at 1.5 m centres; review the other four at the next inspection.
    3. A modern apartment building with dark cladding and glass balconies
      1. Post fixings

      F-12C3 · FairP2

      Balustrade posts on the west balconies

      Finding
      Six balustrade posts show surface corrosion at the base fixings. The balustrades were firm when tested by hand.
      Recommendation
      Load-test a sample of fixings and replace the six corroded posts.
  5. Client chooses

    Recommended works, priced as options

    Priority 1 is included; later works are optional rows the committee ticks. Your fee for each package, tax and the total calculate as they choose.

    Price tables: Essentials and up

    From recommended works to signed works

    Recommended works · our services

    ItemQtyRateAmount
    Priority 1 · within 12 months$29,900
    Roof replacementSpecification, tender and site inspections
    1 package$14,800$14,800.00
    Facade repairsRepair specification and site inspections
    1 package$11,200$11,200.00
    Fire stair doorsDoor schedule and specification
    1 package$3,900$3,900.00
    Priority 2 · 1 to 3 years Tick to add
    1 package$6,400$6,400.00
    1 package$8,600$8,600.00
    1 package$4,800$4,800.00
    Priority 3 · 3 to 5 years Tick to add
    1 plan$7,500$7,500.00
    Subtotal
    $36,300.00
    Tax (10%)
    $3,630.00
    Total
    $39,930.00
  6. Client signs

    Accepted, signed, and the works approved

    The report shows who prepared and reviewed it. The committee chair accepts it with a legally binding eSignature, approving the works they ticked, and you see every step in the activity.

    eSignatures: every plan

    Approvals, review & client sign-off

    Report acceptance

    Revision B · issued 14 May
    1. PreparedHana KowalskiSenior building surveyor12 May
    2. ReviewedRavi MenonAssociate, building services13 May
    3. AcceptedDaniel FeatherstoneChair, owners' committee28 May
    • Report received and read by the committee
    • Works approved: Priority 1 and the condenser replacement

    Approved fees inc. tax$39,930.00

    Daniel Featherstone · Signed online · 28 May, 6:05 pm

    Certificate of authenticity and audit trail attached

    Accepting the report records that it was received and which works were approved. It is not a certificate of compliance.

    Activity

    1. Report openedDaniel Featherstone
    2. Comment on finding F-09Answered by Ravi Menon
    3. Condenser replacement ticked+$7,040.00 inc. tax
    4. Report accepted and signedCertificate of authenticity attached
    5. Signed copy filed to OneDriveThrough Zapier

Win the commission, in the same editor

The sales side of a practice: fees by stage, schedules for specifiers, tenders and the letters that confirm the appointment.

Fenwick ArdenFee proposal · Architectural servicesFA-2405Sample · fictional business

Fees by work stage

Estimated construction cost$1,450,000

StageTimeBasisFee
Brief & concept designSite analysis, brief review, two concept options4 wksFixed$16,500
Developed designPlans, sections, elevations and a materials palette6 wks2.25%$32,625
Technical design & documentationConstruction drawings, specification, consultant coordination10 wks3.5%$50,750
Tender & contract administrationTender, site visits and certificates to practical completionBuild1.75%$25,375
Total fees ex tax$125,250
Hourly rates for additional services
Principal$260/h
Project architect$190/h
Graduate & drafting$130/h

Stages 2 to 4 are a percentage of the estimated construction cost, adjusted to the accepted tender price. Work outside this scope is charged at the hourly rates, agreed in writing first.

Your fees, stage by stage

ItemQtyRateAmount
Design stages$125,250
1 · Brief & concept designFixed fee
1 stage$16,500$16,500.00
2 · Developed design2.25% of $1,450,000
1 stage$32,625$32,625.00
3 · Technical design & documentation3.5% of $1,450,000
1 stage$50,750$50,750.00
4 · Tender & contract administration1.75% of $1,450,000
1 stage$25,375$25,375.00
Additional services Tick to add
1 set$5,400$5,400.00
1 lot$7,800$7,800.00
1 lot$12,600$12,600.00
1 lot$4,200$4,200.00
Subtotal
$130,650.00
Tax (10%)
$13,065.00
Total
$143,715.00
Commencement retainer on signing (10%)
$14,371.50
A house among trees on the bank of a calm river

Fixed, percentage or hourly, stage by stage

A new house priced across four work stages: concept as a fixed fee, the rest as a percentage of the construction cost, with hourly rates for anything extra. The clients tick the additional services they want and the retainer on signing follows.

  • Percentage and Formula columns for fee scales (advanced pricing, Business)
  • Additional services as optional rows
  • A retainer paid on signing through Stripe or PayPal

Price tables: Essentials and up

Staged fee proposals
Fenwick ArdenFinishes & product scheduleFA-S-0417Sample · fictional business

Internal finishes schedule Issue C · for sample approval

CodeItemFinishLocationStatus
FL-01Rubber sheet flooring3 mm, slip-resistant, coved skirtingGraphiteLabs and prep roomsApproved
FL-02Carpet tilesSolution-dyed nylon, 500 × 500 mmSlate blueStaff roomsApproved
WL-01Impact-resistant plasterboard13 mm, low-sheen paintWarm whiteCorridorsFor review
BT-01Laboratory benchtopsSolid phenolic, 16 mm, chemical-resistantBlackLabsSample requested
JN-02Joinery panelsCompact laminate, mattPale oakStorage wallsApproved
CL-01Acoustic ceiling tiles600 × 600 mm, NRC 0.85WhiteTeaching spacesApproved

Generic descriptions shown. Named products and alternatives are listed in the specification issued for tender.

Material samples of dark panels, terrazzo and marble on a white surface

A finishes schedule the client signs off

Codes, descriptions, finishes and locations in one table, sample photos beside it, questions answered in comments, and the college's sample approval signed in the document.

  • Your schedule columns saved as a library block
  • Comments on the document while it's reviewed
  • Approval recorded with a signature and audit trail
Specifications & product schedules
Fenwick ArdenTender response · Design servicesFA-T-0611Sample · fictional business

Contents

  1. 1Executive summarypage 2
  2. 2Understanding of the briefpage 3
  3. 3Methodology & programmepage 5
  4. 4Team & capabilitypage 8
  5. 5Relevant projectspage 10
  6. 6Insurances & registrationspage 13
  7. 7Fee schedulepage 14
  8. 8Departures & assumptionspage 15

Insurances & registrations Company block

Locked company block
  • Professional indemnity$10 millionPolicy PI-40215
  • Public liability$20 millionPolicy PL-88120
  • Workers compensationPolicy WC-51907Every employee
  • Architect registrationReg. no. 10457Sample number · fictional practice
  • Engineer registrationReg. no. PE 66120Sample number · fictional practice
  • Quality systemDesign review at every stageDocumented QA procedure

Sample details for a fictional practice. Written once by the practice manager and locked, so every tender carries the same current wording.

Bookshelves and reading tables in a bright library

Methodology, team and insurances from your library

A council tender assembled from approved library blocks: the contents in the order the council asked for, your insurances and registrations locked, and a lump-sum fee schedule approved by a director before it goes out.

  • Locked company blocks (content locking, Business)
  • Approval on total value (Business)
  • Export a PDF for the council's portal
Tender responses & capability statements
Fenwick ArdenClient agreement · Architectural servicesFA-E-2405Sample · fictional business
Variation AS-02

To fee proposal FA-2405 · Raised 12 Sep · Requested by Nadia Okoro

The council asked for a revised driveway and resubmission, and you asked us to design a home office in the garage.

ChangeIn the agreed scopeNowPrice
Council amendmentsOne planning submissionRevised driveway and resubmission, 14 h at $190+$2,926.00
Garage home officeNot in scopeDesign and documentation, 9 h at $190+$1,881.00
Agreed fee
$143,715.00
Variation AS-01 · Landscape concept
+$4,620.00
This variation (AS-02)
+$4,807.00
Revised fee inc tax
$153,142.00
Effect on time
No change to the programme

Signed before the extra work starts. Fees invoiced with the next monthly invoice.

A modern timber-clad house on a rocky, tree-covered slope

Extra work agreed before it starts

The council asked for amendments and the clients added a home office: each change priced at your hourly rates in its own letter, with the revised fee, signed before the work goes ahead.

  • Its own document, from your fee letter template
  • Hourly rates from the fee proposal
  • Signed online or in person
Engagement letters & fee variations

Send your next fee proposal or report from QuoteCloud

Free for 14 days, no credit card required. Send us your current report or fee proposal template and we'll convert one for you during the trial.

Sample report · FA-M-0932

Every asset rated. Every visit planned.

A mechanical plant inspection for a 12-storey office building: each asset's tag, condition, risk and remaining life in one table, then the year's maintenance schedule, in a report the asset manager accepts online.

Equipment, plant & asset inspection reports
Fenwick ArdenMechanical services inspectionFA-M-0932Sample · fictional business

Asset register 7 of 30 assets shown

AssetConditionRiskActionRemaining life
CH-01Chiller 1, water-cooledPlant room B2C2 GoodLowAnnual service and oil analysis9 years
CH-02Chiller 2, water-cooledPlant room B2C3 FairMediumCondenser tube clean, oil analysis6 years
CT-01Cooling tower 1RoofC4 PoorHighReplace fill and drift eliminators2 years
AHU-03Air handling unit, L4 to L6Plant room L7C3 FairMediumReplace fan bearings and filters7 years
B-01Heating hot water boilerRoof plant roomC2 GoodLowService and combustion check10 years

Reviewed by a director before the client sees it

Make every report from your condition audit template, or every fee proposal over your threshold, wait In Review until the associate and a director approve it.

Approvers see the whole document and approve or decline it, and only then can it be sent. Locked clauses and limitations stay word for word.

  • Triggers on template, total value, discount percentage, team, role or customer
  • Every named approver can be required
  • Standard limitations and terms as locked library blocks

Approval workflow and content locking: Business plan

Approvals, review & client sign-off
Fenwick ArdenBuilding condition auditFA-R-1187Sample · fictional business

Document workflow

In Review

Triggered when Template is Condition audit report

  • Ravi MenonAssociate, building servicesApproved
  • Clara WhitlowDirectorWaiting

Must be approved by all approvers before it can be sent.

  1. Approval request sent by Hana Kowalski
  2. Approved by Ravi Menon

Approval workflow · Business plan

Rated, secure and in business since 2013

  • eIDAS compliant eSignatures
  • 256-bit encryption
  • Hosted on AWS
  • GDPR compliant

From site inspection to signed works

Five steps for a condition audit, with the assessor, the reviewer and the client in the same document.

  1. Start from your report template

    Open your condition audit template with your cover, contents, method and limitations already in place.

  2. Add the site photos

    Drop in photos from the inspection and mark them up in the image editor beside each finding.

  3. Rate and recommend

    Fill in the condition table and price the recommended works, with later priorities as optional rows.

  4. Review, then send

    A director approves the report first (approval workflow, Business plan). Send one link and see when it's opened.

  5. Accepted and signed

    The client ticks the works they want, accepts the report and signs online. Questions come back as comments on the document.

What a QuoteCloud implementation gives a practice

Consistent documents across every studio and discipline, and less time rebuilding the same report.

  • One set of templates

    Fee proposals, reports and letters on your branding, assigned to the teams that use them.

    Practice templates & library
  • Clauses and specifications, approved

    Standard limitations, terms and specification clauses as company library blocks, locked on Business.

    Clause & specification library
  • Roles for every discipline

    Custom roles decide who edits templates, uses the library or sends documents, from Essentials.

    Implementation for practices
  • Review before it's sent

    Reports and large fee proposals approved by an associate or director first, on Business.

    Approvals & sign-off
  • Connected to the office

    Opportunities from your CRM, fees to Xero or QuickBooks, projects to monday.com.

    Integrations
  • Help getting started

    One template converted free in the trial, a 45-minute training session, and onboarding and professional services.

    QuoteCloud implementation for practices

Everything a practice sends

Sales documents, delivery documents and the set-up that keeps them consistent.

Questions from architects and engineers, answered

What is QuoteCloud for architects and engineers?

QuoteCloud is document, proposal and eSignature software that architecture practices, engineering consultancies, building surveyors and specifiers use for the documents they send clients. Fee proposals, tender responses and engagement letters sit beside condition audits, inspection reports, design reports and specifications, built from the same templates and content blocks and accepted or signed online.

Can a fee proposal be priced by work stage or as a percentage of construction cost?

Yes. Give each work stage its own line or section in a price table, as a fixed fee or as a percentage of the estimated construction cost using Percentage and Formula columns (advanced pricing and custom formulas are on the Business plan). Add hourly rates for extra work and additional services as optional rows the client ticks.

Can we write building condition or inspection reports in QuoteCloud?

Yes. A report is a QuoteCloud document built from content blocks: text, tables for condition ratings and asset registers, images marked up in the built-in image editor, a contents block, and a price table for recommended works. There is no stock audit template, so build one from blocks or send us your existing report to convert during the trial.

Does QuoteCloud capture inspection data on site or from sensors?

No. QuoteCloud is not a field-inspection or monitoring app and does not connect to BIM, CAD or building sensors. Your assessor writes the report in the editor, adding photos and ratings, and drawings or schedules exported from your design software can be added as images or PDF pages.

Can clients accept a report and approve recommended works in it?

Yes. Price the recommended works in the report, with later priorities as optional rows. The client ticks the works they want, the total updates, and they accept the report with a legally binding eSignature. Accepting a report records receipt and approval; QuoteCloud does not certify buildings or compliance.

Can reports and fee proposals be reviewed before they are sent?

Yes, on the Business plan. An approval workflow can trigger on the template used, total value, discount percentage, the creator's team or role, or the customer. The document goes In Review and named approvers approve or decline it before it can be sent.

Can we keep standard clauses and specifications consistent across the practice?

Yes. Save limitations, terms of engagement and specification clauses as Company content in the content library, organised in folders, from the Essentials plan. On Business, lock blocks so they can be used in every document but not edited, and restrict library access by role.

Does QuoteCloud connect to our CRM, accounting or project tools?

Xero, QuickBooks Online, HubSpot, monday.com, Microsoft OneDrive, Google Sheets and thousands of other apps connect through Zapier or Make, and the QuoteCloud API is available, from Essentials; API and Zapier document creation has per-document fees.

Is there a free trial?

Yes. QuoteCloud has a free plan and a 14-day free trial of Essentials or Business with no credit card required. During the trial QuoteCloud converts one of your existing templates, such as a fee proposal or report, for free on the Essentials, Business and Enterprise plans, and paid plans include a 45-minute training session.

More questions from practices

Commissions and reports, signed sooner

Free for 14 days. No credit card required.