Nine real QuoteCloud templates for proposals, agreements, sign-offs and plans, and how a practice builds the reports the library doesn't have.

QuoteCloud's template library has nine templates for architecture and engineering work: four architecture proposals, a technical services consulting agreement, a project customer acceptance form, a project management plan and two HVAC templates. There is no audit or inspection report template, so practices build reports from content blocks or send their own report to be converted during the trial.

Two sample documents from a fictional practice, Fenwick Arden. Behind: the cover and contents of a building condition report for The Pembroke, an apartment building, built from content blocks because there is no stock audit template. In front: the cover of a fee proposal for a new house on Riverside Lane, built from an architecture proposal template.

Nine templates to start from

Real templates from the QuoteCloud library: proposals, an agreement, a sign-off form, a project plan and two building services templates. Open one, add your branding and your library blocks, and save it as the practice's own.

All architecture & engineering templates

The templates, built out as practice documents

What the templates become once a practice fills them with its own stages, terms and content. Sample documents from a fictional practice.

Fenwick ArdenFee proposal · Architectural services FA-2405 Sample · fictional business
A house among trees on the bank of a calm river

Fee proposal · Architectural services

Okoro house, Riverside Lane

Prepared for Nadia & Sam Okoro · 3 March · Valid 60 days

A new two-storey, four-bedroom home of about 260 m² on a sloping riverside block, from concept design to practical completion, for an estimated construction cost of $1,450,000.

Fees by work stage

Estimated construction cost$1,450,000

StageTimeBasisFee
Brief & concept designSite analysis, brief review, two concept options 4 wks Fixed $16,500
Developed designPlans, sections, elevations and a materials palette 6 wks 2.25% $32,625
Technical design & documentationConstruction drawings, specification, consultant coordination 10 wks 3.5% $50,750
Tender & contract administrationTender, site visits and certificates to practical completion Build 1.75% $25,375
Total fees ex tax$125,250
Hourly rates for additional services
Principal$260/h
Project architect$190/h
Graduate & drafting$130/h

Stages 2 to 4 are a percentage of the estimated construction cost, adjusted to the accepted tender price. Work outside this scope is charged at the hourly rates, agreed in writing first.

A house among trees on the bank of a calm river

A staged fee proposal from an architecture template

Start from the Architecture Proposal, the Architecture Firm Sales Proposal, the Architecture Sales Proposal or the Construction Proposal Template, which sets out an architect's design process. Built out, the scope becomes fees by work stage.

  • Cover with the client, site and validity date
  • Fee stages as fixed fees or a percentage of construction cost
  • Hourly rates and additional services as optional rows

Price tables: Essentials and up

Staged fee proposals
Fenwick ArdenClient agreement · Architectural services FA-E-2405 Sample · fictional business

Terms of engagement

StartsOn signing
ExpiresPractical completion
  1. ServicesThe services in fee proposal FA-2405, stages 1 to 4, and the additional services you selected.
  2. Fees & invoicingInvoiced monthly in proportion to each stage completed, payable within 14 days.
  3. Additional servicesAgreed in writing before the work starts, at the hourly rates in the fee proposal.
  4. Copyright & licenceWe keep copyright in the design; you have a licence to use it to build this house on this site.
  5. Professional indemnityWe hold professional indemnity insurance for the project and for six years after it.
  6. Suspension & terminationEither party may end the engagement on 14 days' written notice; fees are payable to that date.

Approve the additional services

Nadia Okoro · Client

Signed in person · 14 Sep, 9:20 am

Additional services AS-02

Fee variation
+$4,807.00 inc. tax
Revised fee
$153,142.00 inc. tax

Certificate of authenticity and audit trail attached

A modern timber-clad house on a rocky, tree-covered slope

Terms of engagement the client signs

The Technical Services Consulting Agreement covers scope, rates, timelines and intellectual property for engineers and technical consultants. Built out, it's the practice's engagement letter, with numbered terms and an online signature.

  • Services, fees, copyright and termination as numbered terms
  • Terms as a locked library block on Business
  • Signed online, with a certificate and audit trail
Engagement letters & fee variations
Fenwick ArdenFinishes & product schedule FA-S-0417 Sample · fictional business

Accept and sign

Grace Ndlovu · Business manager

Signed online · 24 Jul, 3:40 pm

Sample approval

Approved
4 of 6 finishes
To follow
BT-01, WL-01

Certificate of authenticity and audit trail attached

Material samples of dark panels, terrazzo and marble on a white surface

A stage, a sample or a report, accepted

The Project Customer Acceptance Form is a short acceptance the client signs online. A specifier uses it for a sample approval: what's approved, what follows, and the client's signature.

  • What's being accepted, stated beside the signature
  • Several signers, each with their own block
  • Certificate of authenticity and audit trail

eSignatures: every plan

Approvals, review & client sign-off
Fenwick ArdenTender response · Design services FA-T-0611 Sample · fictional business

Design programme

StageM1M2M3M4M5M6M7M8M9M10
Concept & schematic Month 1 to 2
Design development Month 3 to 4
Documentation Month 5 to 7
Heritage statement optional Month 2 to 3
Tender Month 8 to 9
Contract award Month 9
Architectural plans with drafting pencils, a metal ruler and a plan tube

The design programme as a Gantt chart

The Project Management Plan sets out objectives, timelines, deliverables and responsibilities. In a tender response it carries the design programme, from concept to contract award, with optional work shown as optional.

  • Stages and milestones in a Gantt chart block
  • Team responsibilities beside the programme
  • Exported as a PDF for a tender portal

Gantt charts: Business

Tender responses & capability statements
Fenwick ArdenMechanical services inspection FA-M-0932 Sample · fictional business

Asset register 7 of 30 assets shown

AssetConditionRiskActionRemaining life
CH-01Chiller 1, water-cooledPlant room B2 C2 Good Low Annual service and oil analysis 9 years
CH-02Chiller 2, water-cooledPlant room B2 C3 Fair Medium Condenser tube clean, oil analysis 6 years
CT-01Cooling tower 1Roof C4 Poor High Replace fill and drift eliminators 2 years
AHU-03Air handling unit, L4 to L6Plant room L7 C3 Fair Medium Replace fan bearings and filters 7 years
B-01Heating hot water boilerRoof plant room C2 Good Low Service and combustion check 10 years
EF-02Car park exhaust fanBasement B1 C4 Poor High Replace motor and isolator 1 year
BMSBuilding management controlsLevel 1 comms room C3 Fair Medium Replace chiller-plant controllers 4 years

Scores 1 (very good) to 5 (very poor) from a visual inspection and the maintenance records on 28 May. Remaining life is an estimate for planning.

Planned maintenance Next 12 months

ServiceJulAugSepOctNovDecJanFebMarAprMayJun
ChillersQuarterly1 visitnonenone1 visitnonenone1 visitnonenone1 visitnonenone
Cooling towersMonthly1 visit1 visit1 visit1 visit1 visit1 visit1 visit1 visit1 visit1 visit1 visit1 visit
Air handling unitsQuarterlynone1 visitnonenone1 visitnonenone1 visitnonenone1 visitnone
BoilerSix-monthlynonenone1 visitnonenonenonenonenone1 visitnonenonenone
Exhaust fansSix-monthlynonenonenone1 visitnonenonenonenonenone1 visitnonenone
Controls (BMS)Annualnonenonenonenonenone1 visitnonenonenonenonenonenone
Visits222322222321

The maintenance plan is part of the report. Your maintenance contractor books and carries out the visits.

Pipes, valves and machinery in a dimly lit basement plant room

Mechanical services, from proposal to maintenance

The HVAC Proposal and the HVAC Maintenance Agreement are written for mechanical services work. A building services engineer can borrow their equipment tables and maintenance layout for a plant report's asset register and the year's maintenance schedule.

  • Asset tags, condition and remaining life in a table
  • A 12-month maintenance schedule
  • Recommended works as a price table
Equipment, plant & asset inspection reports

No audit template in the library? Build yours from blocks.

There is no stock audit, inspection or condition report template. This is the one a practice builds: each part of the Pembroke condition audit, and the content block behind it. Save it as a template and every surveyor starts from it.

  1. Cover and Contents blocks

    A cover in your branding and a Table of Contents block with anchor links, so the building manager can jump straight to the findings. The executive summary is a text block the assessor writes for each building.

    PDF export: Starter and up

    Fenwick ArdenBuilding condition audit FA-R-1187 Sample · fictional business
    A mid-rise apartment building with balconies against a blue sky

    Building condition audit

    The Pembroke, 22 Harbour Row

    Prepared for The Pembroke Owners' Association · 14 May · Revision B

    A visual condition audit of a 1970s six-storey residential building with 36 apartments: roof, facade, balconies, common areas, building services and fire stairs, with the works we recommend over the next five years.

    Contents

    1. 1Executive summarypage 2
    2. 2Method & limitationspage 3
    3. 3Condition ratings by elementpage 4
    4. 4Key findingspage 6
    5. 5Recommended works & feespage 11
    6. 6Acceptancepage 13
  2. Locked block

    Method and limitations, locked

    The practice's standard method and limitations as a locked library block, used as approved in every report. The committee's question sits beside it as a comment.

    Content locking: Business

    Practice templates & library

    Method & limitations

    • Visual, non-invasive inspection from accessible areas on 6 May.
    • Concealed and inaccessible elements were not inspected or tested.
    • Ratings describe condition on the day; they are not a compliance assessment.
    • Budgets are opinions of probable cost, to be confirmed by tender.

    Daniel FeatherstoneCould the condenser replacement wait until next year's levy?

    Ravi, Fenwick ArdenIt can, but we'd add the pipe supports now. We've left it as an option for the committee.

  3. From library

    A table block for every element rated

    Your condition table, with the location, the rating, the risk, the action and the budget, saved to the content library so every audit has the same columns.

    Content library: Essentials and up

    Condition ratings by element 7 of 19 elements shown

    ElementConditionRiskActionPriority · budget
    Roof membrane & flashingsMain roof C4 Poor High Replace membrane, renew flashings P1 · $185,000
    Render & sealant jointsNorth and west facades C4 Poor High Repair cracked render, reseal joints P1 · $96,000
    Fire stair doorsStairs A and B C3 Fair High Adjust closers, replace two door sets P1 · $18,000
    Car park soffitBasement C3 Fair Medium Patch spalling, treat exposed reinforcement P2 · $64,000
    Rooftop condensersRoof plant deck C4 Poor Medium Replace two units, re-support pipework P2 · $42,000
    Balcony balustradesLevels 2 to 6 C3 Fair Medium Test fixings, replace six corroded posts P2 · $28,000
    Common stairs & corridorsAll levels C2 Good Low Repaint, replace worn stair nosings P3 · $38,000

    Ratings 1 (very good) to 5 (very poor), from a visual inspection on 6 May. Budgets are opinions of probable cost for planning, ex tax.

  4. Image blocks, marked up

    Site photos marked up in the built-in image editor with numbered labels, rings and arrows, beside each finding and recommendation.

    Image blocks and image editor: Starter and up

    Key findings

    1. Cracked, crumbling render exposing the brickwork at the base of a wall
      1. Debonded render
      2. Exposed brick

      F-04C4 · PoorP1

      Render cracking at the base of the north wall

      Finding
      Render has cracked and come away at the base of the wall, exposing brickwork and letting water into the wall.
      Recommendation
      Remove loose render, repair the brickwork and re-render; reseal the joints either side.
    2. Rooftop condenser units with fans and refrigerant pipework
      1. Corroded casing
      2. Unsupported pipework

      F-09C4 · PoorP2

      Corrosion on the rooftop condensers

      Finding
      Two of the six condenser units have corroded casings and fan guards, and refrigerant pipework sags between supports.
      Recommendation
      Replace the two units and add pipe supports at 1.5 m centres; review the other four at the next inspection.
    3. A modern apartment building with dark cladding and glass balconies
      1. Post fixings

      F-12C3 · FairP2

      Balustrade posts on the west balconies

      Finding
      Six balustrade posts show surface corrosion at the base fixings. The balustrades were firm when tested by hand.
      Recommendation
      Load-test a sample of fixings and replace the six corroded posts.
  5. Client chooses

    A price table for the recommended works

    Priority 1 included, later priorities as optional rows the committee ticks, with the fees and tax calculated as they choose.

    Price tables: Essentials and up

    From recommended works to signed works

    Recommended works · our services

    ItemQtyRateAmount
    Priority 1 · within 12 months$29,900
    Roof replacementSpecification, tender and site inspections
    1 package $14,800 $14,800.00
    Facade repairsRepair specification and site inspections
    1 package $11,200 $11,200.00
    Fire stair doorsDoor schedule and specification
    1 package $3,900 $3,900.00
    Priority 2 · 1 to 3 years Tick to add
    1 package $6,400 $6,400.00
    1 package $8,600 $8,600.00
    1 package $4,800 $4,800.00
    Priority 3 · 3 to 5 years Tick to add
    1 plan $7,500 $7,500.00
    Subtotal
    $36,300.00
    Tax (10%)
    $3,630.00
    Total
    $39,930.00
  6. Client signs

    An eSignature block for acceptance

    Who prepared and reviewed the report, and the chair's signature accepting it and approving the ticked works. Acceptance records approval; it doesn't certify the building.

    eSignatures: every plan

    Report acceptance

    Revision B · issued 14 May
    1. PreparedHana KowalskiSenior building surveyor12 May
    2. ReviewedRavi MenonAssociate, building services13 May
    3. AcceptedDaniel FeatherstoneChair, owners' committee28 May
    • Report received and read by the committee
    • Works approved: Priority 1 and the condenser replacement

    Approved fees inc. tax$39,930.00

    Daniel Featherstone · Signed online · 28 May, 6:05 pm

    Certificate of authenticity and audit trail attached

    Accepting the report records that it was received and which works were approved. It is not a certificate of compliance.

Send us your current report or fee proposal

Free for 14 days, no credit card required. On Essentials, Business and Enterprise, we convert one of your existing templates for free during the trial.

From your Word report to the practice template

Most practices already have a report format they trust. Keep it, and let QuoteCloud carry it.

  1. Start the trial

    Start a 14-day trial of Essentials or Business. No credit card is needed.

  2. Send us one template

    Send the report or fee proposal you use most. One conversion is free during the trial; more are a paid add-on, per template.

  3. Check it against the original

    Open the converted template, compare it with your Word version and adjust the wording and layout in the editor.

  4. Move the standard parts to the library

    Save the limitations, terms and rating table as library blocks, and lock them on Business.

  5. Assign it to the team

    Save it as a template and use Template Restrictions to show it to the team that sends it.

Your best tender response becomes the next template

Any QuoteCloud document can be saved as a template. When the Riverbend library tender is done, save it: the contents in the order councils ask for, the methodology, the team and the locked insurances stay; the project details are replaced next time.

Templates sit with the teams that use them, so the bid team sees the tender templates and the surveyors see the report templates.

  • Save any document as a template
  • Locked company blocks carried into each new response
  • Templates assigned to each team
  • Exported as a PDF for the council's portal

Templates: Essentials and up · Content locking: Business

Tender responses & capability statements
Fenwick ArdenTender response · Design services FA-T-0611 Sample · fictional business

Contents

  1. 1Executive summarypage 2
  2. 2Understanding of the briefpage 3
  3. 3Methodology & programmepage 5
  4. 4Team & capabilitypage 8
  5. 5Relevant projectspage 10
  6. 6Insurances & registrationspage 13
  7. 7Fee schedulepage 14
  8. 8Departures & assumptionspage 15

Insurances & registrations Company block

Locked company block
  • Professional indemnity$10 millionPolicy PI-40215
  • Public liability$20 millionPolicy PL-88120
  • Workers compensationPolicy WC-51907Every employee
  • Architect registrationReg. no. 10457Sample number · fictional practice
  • Engineer registrationReg. no. PE 66120Sample number · fictional practice
  • Quality systemDesign review at every stageDocumented QA procedure

Sample details for a fictional practice. Written once by the practice manager and locked, so every tender carries the same current wording.

The building blocks behind a practice template

QuoteCloud has 20 content blocks. These are the ones architecture and engineering templates use most.

  • Table of Contents

    A contents block with anchor links to each section, for long reports, tenders and specifications.

  • Images and the image editor

    Photos, renders and drawings, cropped and marked up with labels, rings and arrows. Starter and up.

  • Tables

    Condition ratings, asset registers and finishes schedules, saved to the library with your columns.

  • Price tables

    Fee stages, hourly rates and recommended works, with optional rows and Percentage and Formula columns. Essentials and up.

  • Hide from recipient

    Drafting guidance for your team inside the template, hidden from the client and the PDF.

  • eSignature

    Acceptance and signature blocks for one signer or several, with a certificate and audit trail, on every plan.

Template questions from practices

Which QuoteCloud templates suit architects and engineers?

Nine templates in the library fit architecture and engineering work: the Architecture Proposal, Architecture Firm Sales Proposal, Architecture Sales Proposal and Construction Proposal Template; the Technical Services Consulting Agreement; the Project Customer Acceptance Form; the Project Management Plan; and the HVAC Proposal and HVAC Maintenance Agreement. Each one is fully editable.

Is there a building condition or inspection report template?

No. The QuoteCloud library has no stock audit, inspection or condition report template. Practices build one from content blocks, such as a cover, contents, tables for ratings, marked-up images, a price table for recommended works and an eSignature block, or send their existing report to be converted during the trial.

Can QuoteCloud convert our existing Word report or fee proposal?

Yes. During the trial, QuoteCloud converts one of your existing templates for free on the Essentials, Business and Enterprise plans. Send the report or fee proposal your practice uses most. Further conversions are available as a paid add-on, billed per template; ask us for the price.

Can we save one of our own documents as a template?

Yes. Any QuoteCloud document can be saved as a template, so a finished fee proposal, tender response or report can become the starting point for the next one. Templates and the content library are on the Essentials plan and above, and Template Restrictions show each team the templates meant for it.

Can templates include locked clauses and limitations?

Yes. Save your limitations, terms and insurances as Company blocks in the content library and place them in the template. On the Business plan, lock those blocks so they can't be edited in a document. Only admins and roles with the permission can unlock them, in the library.

Can a template price fees as a percentage of construction cost?

Yes. A price table in the template can give each work stage a fixed fee or a percentage of the estimated construction cost, using Percentage and Formula columns. Advanced pricing and custom formulas are on the Business plan; price tables with optional rows for additional services are on Essentials and above.

More questions from practices

Everything a practice sends

Each page shows a template built out as a sample document from a fictional practice.

Start from a template. Send it as your own.

Free for 14 days. No credit card required.