Getting started with QuoteCloud

Site inspection, defect and status reports

Marked-up site photos, a defects table with locations and who fixes what, and a status report with the programme and next steps.

In QuoteCloud a site inspection or defect report is a document built from content blocks: site photos marked up in the image editor, a defects table with locations, priorities and responsibilities, notes and comments. A project status report adds a Gantt chart of the programme on the Business plan. Clients acknowledge reports with an eSignature.

A sample site inspection report for a fictional practice, Fenwick Arden, at the Okoro house during construction. A site photo of cracked render at the base of the north wall is being marked up in QuoteCloud's image editor, with a tool bar of crop, rotate, text, shapes, arrows, highlight and freehand: a ring is drawn round each defect, an arrow points to the first, and the labels Render cracking and Exposed blockwork appear. Below, the report's defects schedule lists D-01 render cracking (major, builder, by 12 Nov), D-02 cladding joint open (minor, by 12 Nov) and D-03 window head flashing missing (major, by 5 Nov). A chip shows the report acknowledged online by Nadia Okoro.

Three reports from every project

What an architect sends during contract administration, each from its own template, on your letterhead.

Fenwick ArdenSite inspection report FA-D-0214 Sample · fictional business

D-01 · North wall, ground floor

Cracked, crumbling render exposing the brickwork at the base of a wall
  1. Render cracking
  2. Exposed blockwork

Instructions & decisions

  • Builder to rectify D-01 and D-03 before the finish coat of render.
  • Your decision by 5 November: the kitchen benchtop sample (two options in the samples report).
  • Next site visit: 12 November, 9 am.

Sam OkoroDoes the render crack mean the wall has moved?

Oscar, Fenwick ArdenNo, it's a shrinkage crack in the render coat. The builder will cut it out and re-render, and we'll check it on the 12th.

Two people in hard hats reviewing plans on a tablet on site

What we saw, and what happens next

Photos from the visit marked up where the defect is, then the instructions to the builder and the decisions the clients need to make, with their questions answered in comments.

  • Image editor: text, shapes, arrows, highlights and freehand (Starter and up)
  • Comments, replies and @mentions on the report
  • Sent the same day from your site report template
Fenwick ArdenSite inspection report FA-D-0214 Sample · fictional business

Defects schedule After site visit 9

4 open1 fixed1 verified

RefDefectSeverityRectify · byStatus
D-01 Render cracking at the base of the north wallNorth elevation, ground floor Major Builder12 Nov Open
D-02 Cladding joint open at the cornerNorth-east corner, upper floor Minor Builder12 Nov Open
D-03 Window head flashing missingBedroom 2 Major Builder5 Nov Open
D-04 Balustrade glass scratchedRear deck Minor BuilderCompletion Open
D-05 Ceiling access panel out of lineLaundry Minor Builder29 Oct Fixed
D-06 Downpipe not connected to stormwaterSouth-west corner Major Builder29 Oct Verified

Defects are the architect's observations on site. The builder rectifies them under the building contract; we check each one at the next visit.

Cracked, crumbling render exposing the brickwork at the base of a wall

Every defect, its owner and its date

A defects table with the reference, location, severity, who rectifies it and by when, and the status you recorded at the visit. The builder fixes defects under the building contract; you check each one at the next visit.

  • Your table, saved to the content library
  • Status recorded by the architect, visit by visit
  • No task tracking or builder logins: it's the report's own content
Fenwick ArdenProject status report FA-P-2405-10 Sample · fictional business

Project status October

Construction progressFrame, roof and windows complete62%

  • Programme: WatchCompletion 6 MarchTwo weeks later than planned after a wet September
  • Contract sum: On track$1,463,900Including the two signed variations
  • Quality: Watch4 defects openSee the site report, visit 9
  • Decisions needed: Action needed1 due 5 NovKitchen benchtop sample

Next steps

  1. Lock-up by 21 November
  2. Kitchen joinery shop drawings reviewed
  3. Site visit 10 on 12 November

Programme

StageM1M2M3M4M5M6M7M8M9
Frame & roof Month 1 to 3
Windows & cladding Month 3 to 5
Lock-up Month 5
Services & linings Month 5 to 7
Joinery & finishes Month 7 to 9
Practical completion Month 9
Two engineers in hard hats reviewing documents by a window

Progress, programme and decisions

Where the build is against the programme, the contract sum, quality and the decisions you need, with the builder's programme as a Gantt chart, so the clients see the month on one page.

  • Gantt chart block with milestones (Business)
  • Red, amber and green written by you, not calculated
  • Acknowledged with an eSignature

Gantt charts: Business plan

Project plans with QuoteCloud

Through the defects liability period

How a practice might report from practical completion to the final inspection. The dates are your contract's; QuoteCloud sends each report, it doesn't track the period or chase anyone.

  1. Practical completion

    Completion inspection

    A defects report with every item photographed and marked up, issued with the completion paperwork.

    Image editor
  2. Month 3

    First follow-up

    The same schedule, each defect re-checked: fixed, verified or still open.

    From your template
  3. Month 6

    Mid-period visit

    New items the owners raise go into the schedule; their questions come in as comments.

    Comments
  4. Month 12

    Final inspection

    The last report, acknowledged by the owners, closes the period with a signed record.

    eSignature

A sample reporting plan. Your contract sets the defects liability period; QuoteCloud sends no reminders about defects.

A monthly status report clients read

Owners want to know three things each month: is the build on time, is it on budget and what do they need to decide. The status page answers them before the detail, then the programme shows where the time went.

Build each report from last month's structure saved as a template, update the numbers and the Gantt chart, and send it. The clients acknowledge it online, and you see when they opened it.

Gantt charts: Business plan

Fenwick ArdenProject status report FA-P-2405-10 Sample · fictional business

Project status October

Construction progressFrame, roof and windows complete62%

  • Programme: WatchCompletion 6 MarchTwo weeks later than planned after a wet September
  • Contract sum: On track$1,463,900Including the two signed variations
  • Quality: Watch4 defects openSee the site report, visit 9
  • Decisions needed: Action needed1 due 5 NovKitchen benchtop sample

Next steps

  1. Lock-up by 21 November
  2. Kitchen joinery shop drawings reviewed
  3. Site visit 10 on 12 November

Programme

StageM1M2M3M4M5M6M7M8M9
Frame & roof Month 1 to 3
Windows & cladding Month 3 to 5
Lock-up Month 5
Services & linings Month 5 to 7
Joinery & finishes Month 7 to 9
Practical completion Month 9

Acknowledge the status report

Sam Okoro · Client

Signed online · 1 Nov, 7:52 pm

What you're acknowledging

Report
October · report 10
Completion
6 March
Decision due
5 November

Certificate of authenticity and audit trail attached

Issue your next site report from QuoteCloud

Free for 14 days, no credit card required. Send us your current site report and we'll convert it into a template during the trial.

Sample report · FA-D-0214

Seen on site in the morning. In the client's inbox by lunch.

Six defects from visit 9, each with its owner and date, in a report the clients acknowledged the next morning.

Fenwick ArdenSite inspection report FA-D-0214 Sample · fictional business

Defects schedule After site visit 9

4 open1 fixed1 verified

RefDefectSeverityRectify · byStatus
D-01 Render cracking at the base of the north wallNorth elevation, ground floor Major Builder12 Nov Open
D-02 Cladding joint open at the cornerNorth-east corner, upper floor Minor Builder12 Nov Open
D-03 Window head flashing missingBedroom 2 Major Builder5 Nov Open
D-04 Balustrade glass scratchedRear deck Minor BuilderCompletion Open
D-05 Ceiling access panel out of lineLaundry Minor Builder29 Oct Fixed
D-06 Downpipe not connected to stormwaterSouth-west corner Major Builder29 Oct Verified

From site visit to acknowledged report

Five steps an architect repeats every visit.

  1. Visit and photograph

    Walk the site and take photos as you do now; QuoteCloud isn't a site capture app.

  2. Open the site report

    Start from your site report template with the project, the visit number and your standard notes.

  3. Mark up the photos

    Add the photos and mark them up with rings, arrows and labels in the image editor.

  4. Update the defects

    Add new defects to the schedule and record the status of the open ones.

  5. Send for acknowledgement

    Send one link; the clients ask questions in comments and acknowledge the report with an eSignature.

Site and defect reports: questions answered

Can architects write site inspection reports in QuoteCloud?

Yes. A site report is a QuoteCloud document built from content blocks: site photos as image blocks marked up in the built-in image editor, a table for the defects schedule, text for instructions and decisions, and comments. Save it as a template and every site visit starts from the same structure.

Can we mark up site photos with arrows and labels?

Yes. The built-in image editor, on the Starter plan and up, lets you crop, rotate and filter photos and add text, shapes, arrows, highlights and freehand drawing before they go into the report.

Does QuoteCloud have a mobile app for capturing defects on site?

No. QuoteCloud is not a field inspection or offline capture app, and photos aren't uploaded from site automatically. Take photos on site as you do now, then add them to the report in the editor.

Can QuoteCloud track defects or remind the builder?

No. The defects schedule is a table in your report, with the status you record at each visit. QuoteCloud doesn't assign tasks to builders or send defect reminders; customer reminders on the Business plan are for documents that haven't been signed.

Can a project status report include the programme?

Yes, on the Business plan. A Gantt chart block shows stages and milestones, so a monthly status report can show the programme beside the progress summary, the contract sum and the decisions needed.

How does the client confirm they received a report?

They acknowledge it with a legally binding eSignature, with a certificate of authenticity and audit trail, and no account is needed to sign. Document tracking also shows when the report was opened and for how long.

More documents a practice delivers

Audits, design reports and the sign-off that goes with them.

Your next site report, acknowledged sooner

Free for 14 days. No credit card required.