Equipment quotes the buyer configures before signing

Options and add-ons as optional items, spares with editable quantities, a build schedule and a deposit on signing.

Custom equipment builders use QuoteCloud to send machine and equipment proposals: the base machine, options and add-ons as optional items or single-choice groups the buyer selects, spares with quantity editing, a Gantt build schedule (Business), approval on large totals (Business) and a deposit on signing.

A sample equipment proposal from a fictional machine builder, Wexcombe Machine Works, for Brindle Foods: an exploded line drawing of a 9-metre case-packing conveyor with numbered callouts for the frame, a servo indexing unit, a remote-support HMI and a spares kit. In the option card the stainless washdown frame is chosen instead of the painted frame and the subtotal steps from $99,650.00 to $113,850.00 ex tax, or $125,235.00 including tax. The servo indexer and the HMI stay as options to tick and one spares kit is set. Then operations and finance both sign and $37,570.50 is paid on signing.

The buyer configures it inside the proposal

The base machine is fixed. The frame is a single choice, the servo indexer and the remote-support HMI are options to tick, and the spares kit has a quantity the buyer sets. Every change updates the subtotal, tax, total and the 30% paid on signing.

Try it here: change the frame, tick an option, add a spares kit. Brindle's engineers can try combinations before finance signs, and you see what they chose. Options don't depend on one another, so if a combination won't work, say so in the option's note.

  • Single-choice groups for frames, motors or drives
  • Optional items the buyer ticks
  • Quantity editing for spares and consumables
  • Payment on signing as a percentage or a fixed amount

Price tables: Essentials and up

How price tables work
Wexcombe Machine WorksEquipment proposal WM-Q-0388 Sample · fictional business

Machine, options and services

Machine, options and services
ItemQtyRateAmount
Machine
Case-packing conveyor module, 9 m2 lanes · guarding to your layout
1 ea $86,500.00 $86,500.00
Frame · choose one
1 ea Included Included
1 ea $14,200.00 $14,200.00
Options · tick what you need
1 ea $9,800.00 $9,800.00
1 ea $3,600.00 $3,600.00
Spares and services
Spares kitBelts, sensors, bearings · set the number of kits
1 kit · you set this $2,450.00 $2,450.00
Factory acceptance testAt our works, with your product
1 test $2,900.00 $2,900.00
Installation & commissioningOn site, 4 days, 2 engineers
1 job $7,800.00 $7,800.00
Subtotal
$113,850.00
Tax 10%
$11,385.00
Total
$125,235.00
30% on signing, to order long-lead parts
$37,570.50

The equipment proposal, page by page

Wexcombe's proposal for Brindle Foods' line 3 conveyor, from one equipment template.

  1. Wexcombe Machine WorksEquipment proposal WM-Q-0388 Sample · fictional business
    Roller conveyors curving through a large warehouse

    Equipment proposal

    Case-packing conveyor module, line 3

    Prepared for Brindle Foods · Prepared Thu 15 Oct 2026 · Valid until Sun 15 Nov 2026

    A 9-metre case-packing conveyor for line 3, built to your layout and tested at our works before delivery. Choose the frame and the options you need, set the number of spares kits, and the total follows.

    Cover

    The machine, for their line

    A cover from your equipment template names the machine, the line it's built for, the date and the date the price expires.

  2. Wexcombe Machine WorksEquipment proposal WM-Q-0388 Sample · fictional business

    Machine, options and services

    Machine, options and services
    ItemQtyRateAmount
    Machine
    Case-packing conveyor module, 9 m2 lanes · guarding to your layout
    1 ea $86,500.00 $86,500.00
    Frame · choose one
    Painted mild steel frameStandard motors
    1 ea Included Included
    Stainless washdown frameIP66 motors, for wet cleaning
    1 ea $14,200.00 $14,200.00
    Options · tick what you need
    Servo indexing upgradeFor mixed case sizes
    1 ea $9,800.00 $9,800.00
    Remote-support HMIRemote diagnostics by our engineers
    1 ea $3,600.00 $3,600.00
    Spares and services
    Spares kitBelts, sensors, bearings · set the number of kits
    1 kitYou set this $2,450.00 $2,450.00
    Factory acceptance testAt our works, with your product
    1 test $2,900.00 $2,900.00
    Installation & commissioningOn site, 4 days, 2 engineers
    1 job $7,800.00 $7,800.00
    Subtotal
    $113,850.00
    Tax 10%
    $11,385.00
    Total
    $125,235.00
    30% on signing, to order long-lead parts
    $37,570.50

    Price

    Machine, options, spares and services

    The base machine, the frame choice, options to tick and the services that come with it, with the payment on signing worked out from the total.

  3. Wexcombe Machine WorksEquipment proposal WM-Q-0388 Sample · fictional business

    Scope and exclusions

    • Built to Brindle Foods layout drawing L3-04.
    • Electrical supply to the isolator and compressed air to the machine by others.
    • Changes after the approval drawings are quoted as a variation.

    Hamish DoyleCan FAT run with our 12-pack cases as well as the 6-pack?

    Owen, WexcombeYes. Send 40 of each and we'll run both at FAT.

    Scope

    Scope and exclusions, with their question

    What's built to their layout and what's by others. Brindle's operations manager asked about FAT in a comment; Wexcombe answered in the thread.

  4. Wexcombe Machine WorksEquipment proposal WM-Q-0388 Sample · fictional business

    Accept, sign and pay

    2 of 2 signed

    • Hamish DoyleOperations manager SignedFri 23 Oct
    • Nadia PetrovFinance director SignedFri 23 Oct

    30% on signing, to order long-lead parts (30%)

    $37,570.50

    Paid via StripePay with card or PayPal

    Certificate of authenticity and audit trail attached

    Sign

    Operations and finance both sign

    Each signer signs with their own eSignature, and the 30% is paid on signing to order the long-lead parts.

A build schedule the buyer can plan around

Put the build schedule in the proposal as a Gantt chart: approval drawings, long-lead parts, fabrication, factory acceptance test, delivery, installation and site acceptance, week by week.

It's your plan, written into the document the buyer signs, so their shutdown and your workshop are booked against the same weeks. QuoteCloud doesn't track progress against it; update the plan with a revised version if the dates move before signing.

  • Tasks and milestones week by week
  • FAT and site acceptance as milestones
  • Revise before signing; version history on Business

Gantt charts: Business

Project plans in QuoteCloud
Wexcombe Machine WorksEquipment proposal WM-Q-0388 Sample · fictional business

Build schedule

StageW1W2W3W4W5W6W7W8W9W10W11W12W13W14
Design & approval drawings Week 1 to 3
Long-lead parts Week 3 to 7
Fabrication & assembly Week 5 to 10
Factory acceptance test Week 11 to 11
Delivery Week 12
Install & commission Week 13 to 13
Site acceptance Week 14

Send your next machine proposal from QuoteCloud

Free for 14 days, no credit card required. Send us an equipment proposal you use now and we'll convert one template for you during the trial.

Six-figure machines get a second look first

Set an approval rule on total value. Any proposal over $100,000 waits In Review until a director approves it, and only then can it go to the buyer.

Your team sees cost and margin under the same price table, so the director approves the options and the margin together. The buyer's copy never shows either.

  • Rules on total value or discount percentage
  • Costs and margins hidden from the buyer
  • Every named approver can be required

Approval workflow: Business

Discount approvals & hidden margins
Wexcombe Machine WorksEquipment proposal WM-Q-0388 Team view · sample data

Document workflow

In Review

Triggered when Total value greater than $100,000

  • Lucia BrandtDirectorWaiting

Must be approved by all approvers

  1. Approval request sent by Owen Hartley
  2. Waiting for Lucia Brandt

Approval workflow · Business plan

Machine, options and services

Machine, options and services
ItemQtyRateAmount
Machine
Case-packing conveyor module, 9 m2 lanes · guarding to your layout
1 ea $86,500.00 $86,500.00
Frame · choose one
Painted mild steel frameStandard motors
1 ea Included Included
Stainless washdown frameIP66 motors, for wet cleaning
1 ea $14,200.00 $14,200.00
Options · tick what you need
Servo indexing upgradeFor mixed case sizes
1 ea $9,800.00 $9,800.00
Remote-support HMIRemote diagnostics by our engineers
1 ea $3,600.00 $3,600.00
Spares and services
Spares kitBelts, sensors, bearings · set the number of kits
1 kitYou set this $2,450.00 $2,450.00
Factory acceptance testAt our works, with your product
1 test $2,900.00 $2,900.00
Installation & commissioningOn site, 4 days, 2 engineers
1 job $7,800.00 $7,800.00
Subtotal
$113,850.00
Tax 10%
$11,385.00
Total
$125,235.00
30% on signing, to order long-lead parts
$37,570.50

Team view only · cost $79,100.00 · margin 30.5%

What equipment buyers ask before they sign

Answer them in the proposal, in the same place every time, and the questions stop coming back by email.

  • When will it arrive?

    A build schedule with long-lead parts, FAT and delivery as milestones (Gantt charts on Business).

  • What does FAT prove?

    The factory acceptance test as its own line, with what you'll run and the product they send.

  • What's by others?

    Power, air, foundations and removal of the old machine, written as exclusions under the scope.

  • Which spares should we hold?

    A spares kit with a quantity the buyer sets, priced per kit.

  • What about support?

    Warranty and support terms as a locked company block (content locking on Business).

  • How is it paid?

    A percentage on signing for long-lead parts; later payments invoiced from your own system.

An equipment proposal in five steps

From a machine family template to a signed proposal with the deposit paid.

  1. One template per machine family

    The base machine, its frame choices and the usual options are already in it.

  2. Set this buyer's options

    Add or remove options from your price book and note anything that won't combine.

  3. Add the schedule and scope

    The Gantt build schedule (Business), scope, exclusions and the expiry date.

  4. Approve the big ones

    Over your value limit, a director approves it before it goes (Business).

  5. They configure and sign

    The buyer picks the frame, ticks options, sets spares, then both signers sign and pay the deposit.

Equipment proposal questions, answered

Can buyers choose options in an equipment proposal?

Yes. Put alternatives such as frame or motor sizes in a single-choice group, extras as optional items the buyer ticks, and spares with quantity editing so the buyer sets how many. The subtotal, tax, total and any payment on signing update as they choose. Price tables are on Essentials and above.

Does QuoteCloud stop combinations of options that won't work?

No. QuoteCloud doesn't have configuration rules or dependencies between options. Keep incompatible choices in the same single-choice group where you can, and say in an option's note when it needs or excludes another. Your engineers check the final configuration before the order.

Can we include a build schedule?

Yes, as a Gantt chart in the proposal on the Business plan: tasks, milestones such as the factory acceptance test and delivery, week by week. It's your plan in the document the buyer signs; QuoteCloud doesn't track the build against it.

How do deposits work on a machine?

Set a payment on signing, a percentage of the total or a fixed amount, paid through Stripe or PayPal on Essentials and above. It is paid once, when the buyer signs. Later stage payments, such as on delivery or site acceptance, are invoiced from your own accounting system.

Can large proposals be approved before they're sent?

Yes. On the Business plan, an approval rule on total value or discount percentage holds a proposal In Review until the named approvers approve it. Your team sees cost and margin while the buyer's copy never shows them.

More questions from manufacturers

More for manufacturers

Every page of the QuoteCloud manufacturing microsite, from the RFQ to the supply agreement.

Your next machine, configured and signed

Free for 14 days. No credit card required.