Getting started with QuoteCloud

Bathroom renovation quotes, staged and signed version by version

Strip-out to fit-off as priced stages, a programme the owners can plan around, and every change as a revised version they sign.

Bathroom renovation plumbers use QuoteCloud to quote by stage with group subtotals, put fixture and tile selections and upgrades in as options, show the programme as a Gantt chart (Business), and handle each change by revising the last version, so the owners sign the new version and the earlier one is kept (version history, Business).

A bathroom shower wall building up layer by layer beside a fictional renovation quote, WP-B-0417 version 2: stage 1, strip-out to the bare frame, $2,090; stage 2, rough-in pipes, $2,885; stage 3, waterproofing and tiling, $4,990; stage 4, fit-off of the shower, mixer and heated rail, $6,080. Then the heated towel rail and tiled niche options, $1,100, and the total of $18,859.50 including tax, signed by both owners.

Priced by stage, with a programme to plan around

The McLeods' renovation is four stages, each a section of the price table with its own subtotal: strip-out, rough-in, waterproofing and tiling, fit-off. The tile allowance is written as your allowance, at a rate per square metre.

Under it, the programme as a Gantt chart: fifteen working days with the rough-in check and the handover as milestones. The owners can plan three weeks without a bathroom, and the options are there to tick before they sign.

  • Stages as sections with subtotals
  • Options the owners tick
  • The programme as a Gantt chart

Price tables: Essentials and up · Gantt charts: Business

Project plans and Gantt charts
Weirbrook Plumbing & GasBathroom renovation quote WP-B-0417 · v2 Sample · fictional business

Your renovation, by stage

ItemQtyRateAmount
Stage 1 · Strip-out$2,090
Strip-out, removal & skipTiles, fixtures, vanity and screed
1 job $1,850 $1,850.00
Cap water & drainage while open
1 job $240 $240.00
Stage 2 · Rough-in$2,885
Drainage rough-in, relocate floor waste
1 job $1,960 $1,960.00
Hot & cold water pointsCopper, to the new layout
5 pt $185 $925.00
Stage 3 · Waterproofing & tiling$4,990
Waterproofing membrane, floor & showerBy our tiling partner, with their certificate
1 job $1,150 $1,150.00
Wall & floor tiling, labour
24 m² $95 $2,280.00
Tile allowanceYour selection, up to $65 a square metre
24 m² $65 $1,560.00
Stage 4 · Fit-off$6,080
Vanity, basin & mixer fit-off
1 job $640 $640.00
Shower rail, mixer & screen fit-off
1 job $720 $720.00
In-wall cistern & wall-hung pan
1 job $1,240 $1,240.00
Fixtures package, supplied by usAs selected on your fixtures schedule
1 set $3,480 $3,480.00
Options Tick to add
1 ea $680 $680.00
1 ea $420 $420.00
1 job $1,150 $1,150.00
Subtotal
$17,145.00
Tax (10%)
$1,714.50
Total
$18,859.50
Deposit on signing (10%)
$1,885.95

Programme · 15 working days

StageD1D2D3D4D5D6D7D8D9D10D11D12D13D14D15
Strip-out Day 1 to 2
Rough-in Day 3 to 5
Rough-in check Day 6
Waterproofing & cure Day 6 to 8
Tiling Day 9 to 12
Fit-off Day 13 to 14
Handover Day 15

Every change is a new version they sign

"Can we just add…" is priced and signed before it's done. Holly revises the last version, the owners sign the new one, and every earlier version is kept.

  1. Mon 5 Oct · Holly MarchettiKept in history

    Version 1: First quote, after the measure-up

    Total inc. tax$17,649.50

  2. Wed 14 Oct · Holly MarchettiSigned

    Version 2: Heated rail and shower niche added

    Two options ticked after Fiona's comment+$1,210.00

    Total inc. tax$18,859.50

    Fiona and Ewan signed online · 10% deposit paid

  3. Wed 4 Nov · Holly MarchettiSigned

    Version 3: Cracked floor waste, found at strip-out

    Replace the old waste line to the stack+$704.00

    Total inc. tax$19,563.50

    Signed by both before the work was done

    No new payment on signing

Each change is the last version revised and signed again, with the earlier versions kept in version history (Business plan). QuoteCloud takes the deposit on signing only; Weirbrook's stage invoices, including the v3 change, are its own. There's no variation module and no allowance reconciliation: a difference goes into a revised version.

Change orders and variations

Both owners sign the version that counts

A renovation usually has two decision makers. Add both as signers: each gets their own link, signs with a legally binding eSignature, and the quote shows who has signed.

The version history sits in the document too, so there's never a question about which price was agreed.

  • Several signers on one quote
  • No account needed to sign
  • Version history beside the signatures

eSignatures: every plan · version history: Business

Free eSignatures
Weirbrook Plumbing & GasBathroom renovation quote WP-B-0417 · v2 Sample · fictional business

Version history Business plan

  1. v2 Added the heated towel rail and the tiled nicheWed 14 Oct · Holly Marchetti $18,859.50Signed
  2. v1 First quote, sent after the measure-upMon 5 Oct · Holly Marchetti $17,649.50Superseded

Each change is a revised version the McLeods sign; the earlier version is kept, never overwritten.

Accept version 2, sign and pay the deposit

2 of 2 signed

  • Fiona McLeodHomeowner SignedThu 15 Oct
  • Ewan McLeodHomeowner SignedThu 15 Oct

Deposit on signing (10%)

$1,885.95

Paid via StripePay with card or PayPal

Certificate of authenticity and audit trail attached

Quote your next renovation stage by stage

Free for 14 days, no credit card required. We'll convert your renovation quote into a template during the trial.

What goes in a renovation template

Set it up once per room type and every quote starts complete.

  • Stages and standard lines

    Strip-out to fit-off, each with the lines you always include.

  • Upgrades as options

    Niches, heated rails and full-height tiling, ready to tick.

  • A programme

    A Gantt chart you adjust per job (Business).

  • Locked terms

    Waterproofing, access and change terms locked so they're the same on every quote (content locking, Business).

  • Selections

    A gallery of the fixtures and tiles the owners chose (Starter and up).

  • Two signers

    Both owners sign, each on their own link.

A change mid-job, in five steps

What happens when the strip-out finds something, or the owners change their minds.

  1. Stop and note it

    Photograph what you found, or note what the owners asked for.

  2. Revise the last version

    Open the signed quote and revise it: the change becomes version 3.

  3. Price the change

    Add the lines from your price book; the total updates.

  4. Send to both owners

    Each signs the new version online or on your tablet.

  5. Then do the work

    Version 3 is agreed and version 2 is kept in the history.

Questions plumbers ask

How do I quote a bathroom renovation by stage?

Make each stage a section of the price table, such as strip-out, rough-in, waterproofing and tiling, and fit-off, with its own lines and subtotal. Add upgrades as optional rows the owners tick. A Gantt chart can show the programme on the Business plan.

How are changes handled once the quote is signed?

Revise the last version: the change becomes a new version with its own price, and the owners sign it before you do the work. Earlier versions are kept in version history on the Business plan. QuoteCloud has no separate variation module.

Can both owners sign?

Yes. Add several signers to one quote. Each gets their own link, signs with a legally binding eSignature without needing an account, and the document shows who has signed. A signing order isn't set: each signs when they're ready.

Does QuoteCloud bill the stages as we go?

No. QuoteCloud takes a deposit or full payment when the quote is signed, through Stripe or PayPal. Stage invoices are yours, from your accounting system. Xero and QuickBooks connect natively on Business or through Zapier.

Can I include a tile allowance?

Yes, as a line in your price table with your own wording, for example a rate per square metre up to an amount. QuoteCloud doesn't track or reconcile allowances: if the selection costs more, the difference goes into a revised version the owners sign.

More questions from plumbers

More for plumbing businesses

Every page of the QuoteCloud plumbing services microsite.

Your next plumbing quote, signed on site

Free for 14 days. No credit card required.